Utility and Grade Work Continuing in Preparation for Highway 56 Construction Project

April 10, 2020
By: Dwayne Page

Jones Brothers Contractors, LLC is continuing its work grading, clearing trees, structures, and making utility relocations in preparation for road construction on Highway 56 south (McMinnville Highway).

During construction, the Tennessee Department of Transportation is advising motorists to use caution and watch for construction equipment and personnel in the roadway.

“The contractor will continue installing concrete box culverts and drainage structures. Grade work and utility work on the new roadway alignment are ongoing. No change in traffic patterns, traffic is still using the existing SR-56. Motorists are advised to use caution and watch for construction equipment adjacent to roadway. Flaggers may be present to move equipment across roadway, unload equipment, or complete utility work,” according to TDOT’s weekly report.

TDOT opened bids last June and Jones Brothers Contractors, LLC was the low bidder on the construction project at $43,691,948 which will be done in two phases from south of state highway 288 near Magness Road to East Bryant Street in Smithville and from south of the Warren-DeKalb County line to near Magness Road in DeKalb County. A proposed third segment from near State Route 287 in Warren County to near the DeKalb County Line is not yet ready for bid letting.

The state plans to build largely two lanes of a proposed four lane project and maintain traffic on the existing Highway 56 (alignment) while construction is done on the new portion.

The estimated completion date for the two phases is May 31, 2022.

WJLE Radio